- Company
- Occupational safety
- Compliance
- Regulations and certificates
- Vacansies
- Management System
- Technical documentation
- Certificates
Projects
Task
Gas piston installation based on the 6M33NG engineRealization
The gas piston unit based on the 6M33NG engine was purchased in February 2020. It is used to meet the own needs of Energodieselcenter LLC. It is operated as the main source of power supply in 24/7 mode.
Regular maintenance has made it possible to achieve the absence of the need for cylinder head repairs after 20,000 hours of operation. As of July 2024, the operating time is 24,500 hours.
Regular maintenance has made it possible to achieve the absence of the need for cylinder head repairs after 20,000 hours of operation. As of July 2024, the operating time is 24,500 hours.
Count
1
Engine model
6М33NG
Partner
